Scoping of EIA for the development of Petroleum Terminal and Storage Project in Kyauk Tan Township (Near Thilawa SEZ) by Brighter Energy Company Ltd. (BE)

Brighter Energy Company Ltd. (BE) is developing the petroleum Terminal and Storage Project located at the semi-urban in the Kyauktan Township to the south of Yangon and covers a total of approximately 112.5 acres. The project includes Jetty Terminal, Tank Farm (Diesel, Gasoline, LPG), and Interconnecting pipelines and advanced utilities.

Under the Environmental Conservation Law and Environmental Conservation Rules of the Republic of the Union of Myanmar, BE is required to undertake an Environmental Impact Assessment (EIA) study to obtain an Environmental Compliance Certificate (ECC) for the proposed activities. On behalf of BE, Environmental Resources Management (ERM) and Resource & Environment Myanmar (REM), are currently undertaking an EIA Study in accordance with the Myanmar EIA Procedure (2015), which includes Scoping Study that has been completed in July and August.

Information on the project is available at BE’s webpage www.brighterenergy.com. Any queries, comments, or suggestions on the Project and the EIA Study can be provided in writing to rathapon.p@brighterenergymm.com/saiayechan@brighterenergymm.com

 

Brighter Energy Company Limited (BE) မှ ကျောက်တန်းမြို့နယ်အတွင်းရှိ (သီလဝါအထူးစီးပွားရေးဇုန်အနီး) Petroleum Terminal and Storage စီမံကိန်းဆောင်ရွက်ခြင်းအတွက် ပတ်ဝန်ကျင်ထိခိုက်မှုဆန်းစစ်ခြင်း (နယ်ပယ်တိုင်းတာခြင်းဆိုင်ရာလေ့လာချက်)

Brighter Energy Company Ltd. (BE) is developing the petroleum Terminal and Storage Project located at the semi-urban in the Kyauktan Township to the south of Yangon and covers a total of approximately 112.5 acres. The project includes Jetty Terminal, Tank Farm (Diesel, Gasoline, LPG), and Interconnecting pipelines and advanced utilities.

Under the Environmental Conservation Law and Environmental Conservation Rules of the Republic of the Union of Myanmar, BE is required to undertake an Environmental Impact Assessment (EIA) study to obtain an Environmental Compliance Certificate (ECC) for the proposed activities. On behalf of BE, Environmental Resources Management (ERM) and Resource & Environment Myanmar (REM), are currently undertaking an EIA Study in accordance with the Myanmar EIA Procedure (2015), which includes Scoping Study that has been completed in July and August.

Information on the project is available at BE’s webpage www.brighterenergy.com. Any queries, comments, or suggestions on the Project and the EIA Study can be provided in writing to rathapon.p@brighterenergymm.com/saiayechan@brighterenergymm.com